❌

Normale Ansicht

Russia’s Key Black Sea Port Resumed Oil Loading Over Weekend

09. März 2026 um 13:08
Russia’s Sheskharis oil terminal at the Black Sea port of Novorossiysk resumed loadings over weekend, bringing some relief to the global market amid the Middle East conflict.

Oil tankers moored at the Sheskharis terminal in Novorossiysk on March 8, 2026 indicate that the facility has resumed operations after a drone strike at the start of the month.

Hormuz Convoys Won’t Fix Vital Oil and Gas Flows Overnight

04. März 2026 um 13:00
US military escorts are urgently needed, but it’s ultimately the ship captains who decide whether to sail.

TOPSHOT - A motorboat cruises along the shore off the town of Al Jeer on the Strait of Hormuz in the northern emirate of Ras Al Khaimah, with a tanker seen in the background, on February 25, 2026. (Photo by FADEL SENNA / AFP via Getty Images) Photographer: FADEL SENNA/AFP

Ukraine Strikes Russian Oil Drilling Platforms in Caspian Sea

11. Januar 2026 um 15:23
Ukraine overnight targeted three drilling platforms in the Caspian Sea owned by Russian oil major Lukoil in the latest move to weaken Russia’s economic capacity to fund its war effort.

A picture taken on April 7, 2011 shows Russian LUKOIL ice-resistant fixed platform LSP-1, built at the Astrakhansky Korabel shipyard, intended to drill and operate wells and collect and pre-treat reservoir content at Korchagin's oil field in the Russian sector of the Caspian Sea some 180kms outside Astrakhan. The fields productivity of oil and gas condensate will peak at 2.3 million tonnes oil and 1.2 bcm gas per year. AFP PHOTO / MIKHAIL MORDASOV (Photo credit should read MIKHAIL MORDASOV/AFP via Getty Images)

Ukraine Strikes Russian Oil Drilling Platforms in Caspian Sea

11. Januar 2026 um 15:23
Ukraine overnight targeted three drilling platforms in the Caspian Sea owned by Russian oil major Lukoil in the latest move to weaken Russia’s economic capacity to fund its war effort.

A picture taken on April 7, 2011 shows Russian LUKOIL ice-resistant fixed platform LSP-1, built at the Astrakhansky Korabel shipyard, intended to drill and operate wells and collect and pre-treat reservoir content at Korchagin's oil field in the Russian sector of the Caspian Sea some 180kms outside Astrakhan. The fields productivity of oil and gas condensate will peak at 2.3 million tonnes oil and 1.2 bcm gas per year. AFP PHOTO / MIKHAIL MORDASOV (Photo credit should read MIKHAIL MORDASOV/AFP via Getty Images)
❌